The WaveBond Tunnel™ System takes mountains of RAP and creates with PEAR™ a 100% usable hotmix. This system allows the recovery of existing, brittle asphalt on location or at a RAP material storage yard. This saves the mining and transportation for more aggregate and reduces the amount of crude oil that has to be processed into liquid asphalt by 80%. That’s 1 barrel of crude oil saved from refining for every four tons RAP material used.

On Site

Allows the recovery of existing, brittle asphalt on location or at a RAP material storage yard

Reuse Existing Binder

Reuse of existing asphalt binder reduces need for new binder
by up to 80%

img-center

Transforms RAP

Transforms RAP stockpiles into PTR™ Enhanced HMA on site

Phononic

Phononic waves heat
the liquid binder in the RAP 
but not the aggregate

     


The WaveBond Tunnel™ Systems process allows the recovery of existing, brittle asphalt on location or at a RAP material storage yard. The WaveBond Tunnel™ System takes mountains of RAP and creates with PRISM’S PEAR™ a 100% usable hotmix. 

125 Tires Per Lane Mile

For a reclaimed RAP material lane mile, 125 used tires are reused to create a superior road.

Crude Oil Reduction

Every mile of roadway made with 100% RAP eliminates 250 barrels of crude oil production

Patent No:

62/458982

100% Hotmix

 

Carbon Savings

Reduction of trucking to and from production facilities eliminates up to 1 ton of carbon emissions for every 1 lane mile of roadway